Pool renovation with deck jets, Cocoa
A renovation finished in pebble with a blue-green glass mosaic waterline and a mosaic-clad tanning shelf. Laminar deck jets arc into the pool from a resurfaced white deck under the screen enclosure.


- Scope
- Renovation
- Location
- Cocoa
- Interior
- Element Series Pebble, Cobalt White
- Completed
- 2026
Before and after
Drag to compare. Same footprint, new everything you touch.
BeforeAfterWhat we found
The pool was leaking in two places. Water was getting out through the light niche, and the sheer descent water feature was leaking as well.
On top of that the deck was settling and the plaster was delaminating and out of date.
How we sequenced it
Demo first. The light niche was replaced, which took care of the leak behind the light. The sheer descent came out and deck jets were plumbed in to replace it, then the shell was waterproofed.
A new glass tile mosaic went on, the deck was renovated, retextured and painted, and a new light was set in the new niche. Bond coat, Tempool Element Series pebble in Cobalt White, and an Orenda startup.
Where it landed
Both leaks are gone at the source — a new niche behind the light and deck jets where the sheer descent used to be. New mosaic, new pebble interior, resurfaced deck. The backyard feels updated and new, and the homeowners are extremely happy.






















What went in
Questions we get on this kind of job
How long does a pool renovation take?
It depends on scope, permitting, weather, and material lead times. A builder who quotes a day count before seeing your shell is guessing. What you should expect is a dated schedule before work starts, and that is what we give you.
Why does coping go on before waterline tile?
Setting coping first means the tile band is only cut once, and it lets the waterproofing run continuously behind both. Tiling first forces a second cut and leaves a break in the waterproofing at the joint most exposed to sun and pool chemistry.
When do I pay?
Milestone billing. Each stage of the schedule triggers its own invoice, and a stage is only billed once it's complete. Nothing is billed ahead of the work.
Have a pool that looks like the before?
Luke walks it himself and prices it line-item by trade. You'll have a dated schedule before anything comes apart.
