Waterfront pool rebuild, Cocoa Beach

A waterfront rebuild that began with removing the original pool and its failing deck. New block retaining walls, a fully formed and waterproofed shell, dark blue waterline tile, a raised spa and a new screen enclosure, with the canal a few feet behind the work.

Completed pool under the new screen enclosure on the waterfront, Cocoa Beach
Scope
New build
Location
Cocoa Beach
Interior
CL Industries Quartz, Mystic Series
Completed
2024

Before and after

Drag to compare.

Original pool and raised spa before removal, Cocoa Beach waterfrontBeforeAfter
The job

What we found

The pool had been repaired more than once and was still settling. At some point it had been pressure grouted back up. When the owners decided to build a new home, the pool came out.

How we sequenced it

The existing pool was removed, and the new one went in from the ground up. Excavation, steel, shotcrete, then waterproofing on the shell, followed by plumbing, tile and equipment. The deck came next, then bond coat, a CL Industries Quartz interior in the Mystic Series, and an Orenda startup.

The new pool has a spa and full automation. Alfred Innovations, a separately licensed company, built the screen enclosure on the same schedule as the pool. One crew, one schedule. The enclosure was built with a mega view panel, so the river behind the house is what you look at from the water.

Where it landed

A new shell in place of one that kept settling, with a spa, automation, and an enclosure that keeps the view of the river open. The homeowners absolutely loved the end result.

Excavator breaking out the original pool shell, Cocoa Beach
Original shell broken out beside the canal, Cocoa Beach
Site cleared back to sand on the waterfront lot, Cocoa Beach
Dewatering the old shell before removal, Cocoa Beach
Old shell drained behind safety fencing, Cocoa Beach
Block retaining wall built along the boundary, Cocoa Beach
Completed retaining wall before the new pool was set out, Cocoa Beach
Plumbing runs laid into the new pool excavation, Cocoa Beach
Formwork and steel for the new shell beside the water, Cocoa Beach
Formed pool shell with the canal beyond, Cocoa Beach
Raised spa box formed alongside the new pool, Cocoa Beach
Dark blue tile set on the raised spa, Cocoa Beach
Blue tile band running along the pool wall, Cocoa Beach
Spa tiled and shell ready for interior finish, Cocoa Beach
Finished shell with tile, spa and steps before filling, Cocoa Beach
Valve manifold and heat pump at the new equipment pad, Cocoa Beach
Completed equipment pad with filter, pump and valves, Cocoa Beach
New pool clear and filled with wide entry steps, Cocoa Beach
New pool and raised spa seen down its length, Cocoa Beach

What went in

InteriorCL Industries Quartz, Mystic Series · new pool construction

Questions we get on this kind of job

How long does a pool renovation take?

It depends on scope, permitting, weather, and material lead times. A builder who quotes a day count before seeing your shell is guessing. What you should expect is a dated schedule before work starts, and that is what we give you.

Why does coping go on before waterline tile?

Setting coping first means the tile band is only cut once, and it lets the waterproofing run continuously behind both. Tiling first forces a second cut and leaves a break in the waterproofing at the joint most exposed to sun and pool chemistry.

When do I pay?

Milestone billing. Each stage of the schedule triggers its own invoice, and a stage is only billed once it's complete. Nothing is billed ahead of the work.