A resurfacing taken from stained, failing plaster through to a new blue pebble interior with fresh waterline tile. Photographed before, during and after, including the empty shell in new finish before filling.

Renovated pool with blue pebble interior finish and resurfaced deck, Cocoa
Scope
Renovation
Location
Cocoa
Interior
Element Series Pebble, Celeste
Completed
2024

Before and after

Drag to compare. Same footprint, new everything you touch.

Faded and stained turquoise plaster with a worn concrete deck before renovation, CocoaBeforeAfter
The job

What we found

The owners wanted their pool brought up to date, and it was losing water. The leak was between the skimmer throat and the shell.

How we sequenced it

Demo — the old plaster chipped out — then waterproofing on the shell, including the skimmer throat where the water was getting out. New 6x6 ceramic tile went in with epoxy grout.

Bond coat was rolled on, then Tempool Element Series pebble in Celeste, and an Orenda startup to finish.

Where it landed

The leak is sealed at the skimmer throat, and the pool has a clean, durable pebble interior over a waterproofed shell with new tile. The owners are extremely happy with the finish and with how much it changed the look of the backyard.

Freshly applied blue pebble finish and new waterline tile before the pool is filled, Cocoa
New blue pebble finish on the entry steps and bench of an empty pool shell, Cocoa
Empty pool shell in new pebble finish beside the rock waterfall before filling, Cocoa
Entry steps and bench in new blue pebble finish at a renovated Cocoa pool
Blue accent tile inlaid in the pebble finish at a step edge, Cocoa
Return fitting set flush in a new blue pebble interior finish, Cocoa

What went in

InteriorElement Series Pebble, Celeste · pool renovation

Questions we get on this kind of job

How long does a pool renovation take?

It depends on scope, permitting, weather, and material lead times. A builder who quotes a day count before seeing your shell is guessing. What you should expect is a dated schedule before work starts, and that is what we give you.

Why does coping go on before waterline tile?

Setting coping first means the tile band is only cut once, and it lets the waterproofing run continuously behind both. Tiling first forces a second cut and leaves a break in the waterproofing at the joint most exposed to sun and pool chemistry.

When do I pay?

Milestone billing. Each stage of the schedule triggers its own invoice, and a stage is only billed once it's complete. Nothing is billed ahead of the work.

Have a pool that looks like the before?

Luke walks it himself and prices it line-item by trade. You'll have a dated schedule before anything comes apart.

Call 321-890-4676Book a walk-through