The job

What we found

No pool in the backyard.

How we sequenced it

This one is a plunge pool with a precast concrete tank. The hole was dug, the tank was set in it, and the shell was waterproofed. Coping went on, then plumbing and equipment, then Ballystone tile.

A paver deck was laid around it, followed by bond coat, Tempool Element Series pebble in Verde White, and an Orenda startup.

Where it landed

The right size for a party, and small enough to heat quickly. A pebble finish, Ballystone tile and a paver deck around it. Easy to keep, and the homeowner is very happy with the value.

Wide view of a rectangular pool and tumbled paver deck with open lawn and oaks beyond, Merritt Island
Low angle across a tumbled grey paver deck to a rectangular pool beside a covered lanai, Merritt Island
Rectangular pool and wide paver deck with a children's playset and open lawn beyond, Merritt Island
Two chaise loungers on a paver deck facing a rectangular pool, Merritt Island
Tumbled paver deck running to the mitred corner of a rectangular pool, Merritt Island
Close view between two woven loungers to the waterline of a Merritt Island pool
Low view across a paver deck to a rectangular pool with bullnose paver coping
Overhead view of a rectangular pool showing entry steps, tanning ledge and bullnose paver coping

What went in

InteriorElement Series Pebble, Verde White · new pool construction

Questions we get on this kind of job

How long does a pool renovation take?

It depends on scope, permitting, weather, and material lead times. A builder who quotes a day count before seeing your shell is guessing. What you should expect is a dated schedule before work starts, and that is what we give you.

Why does coping go on before waterline tile?

Setting coping first means the tile band is only cut once, and it lets the waterproofing run continuously behind both. Tiling first forces a second cut and leaves a break in the waterproofing at the joint most exposed to sun and pool chemistry.

When do I pay?

Milestone billing. Each stage of the schedule triggers its own invoice, and a stage is only billed once it's complete. Nothing is billed ahead of the work.

Thinking about a pool like this one?

Luke walks it himself and prices it line-item by trade. You'll have a dated schedule before anything comes apart.