LUKE GELL POOLS

Lap pool and deck, Satellite Beach

A new lap pool built into a narrow back yard: excavation, formed and steel-reinforced shell, poured deck, full equipment pad with heat pump and automation, and a screen enclosure over the finished pool.

New pool seen down its length from the deck, Satellite Beach
Scope
New build
Interior
PMM Freestone, Antigua
Completed
2023

Before and after

Drag to compare.

Formed shell with steps shaped at the shallow end, Satellite BeachBeforeAfter
The job

What we found

No pool in the backyard, and a simple brief. Somewhere to sit, relax, and cool off after the beach.

How we sequenced it

Layout, excavation, steel, shotcrete, then waterproofing on the shell. Plumbing and equipment went in, then tile and the deck. Bond coat, a PMM Freestone interior, and an Orenda startup.

The pool was built with a sun shelf, which is the sitting and cooling off they asked for. Alfred Innovations, a separately licensed company, built the screen enclosure on the same schedule as the pool. One crew, one schedule.

Where it landed

The pool does what they asked of it. A sun shelf to sit on, a screened deck around it, and cool water after the beach. The homeowners are very happy, and it is the coolest hangout spot in the neighborhood.

Excavator working the pool dig behind the house, Satellite Beach
Formed shell with bracing and plumbing runs set, Satellite Beach
Steel and formwork through the pool shell, Satellite Beach
Formed and braced shell seen from the house, Satellite Beach
Equipment pad slab poured beside the house, Satellite Beach
Shell formed and braced behind safety fencing, Satellite Beach
Pool shell before shotcrete with the deck area set out, Satellite Beach
Coping and edge detail set on the shell, Satellite Beach
Plate compactor used on the deck base, Satellite Beach
Shell complete with the yard graded around it, Satellite Beach
Finished shell with steps before the deck was poured, Satellite Beach
Shell and spa area formed before finishing, Satellite Beach
Pool shell set in the graded back yard, Satellite Beach
Plumbing manifold stubbed up at the equipment pad, Satellite Beach
Pipework run to the equipment pad before backfill, Satellite Beach
Deck base prepared alongside the pool, Satellite Beach
New filter and pump plumbed at the equipment pad, Satellite Beach
Valve manifold at the new equipment pad, Satellite Beach
Heat pump installed beside the house, Satellite Beach
Automation wiring at the equipment pad, Satellite Beach
Completed pool and deck beside the house, Satellite Beach

What went in

InteriorPMM Freestone, Antigua · new pool construction

Questions we get on this kind of job

How long does a pool renovation take?

It depends on scope, permitting, weather, and material lead times. A builder who quotes a day count before seeing your shell is guessing. What you should expect is a dated schedule before work starts, and that is what we give you.

Why does coping go on before waterline tile?

Setting coping first means the tile band is only cut once, and it lets the waterproofing run continuously behind both. Tiling first forces a second cut and leaves a break in the waterproofing at the joint most exposed to sun and pool chemistry.

When do I pay?

Milestone billing. Each stage of the schedule triggers its own invoice, and a stage is only billed once it's complete. Nothing is billed ahead of the work.

Thinking about a pool like this one?

Luke walks it himself and prices it line-item by trade. You'll have a dated schedule before anything comes apart.

Call 321-890-4676Book a walk-through