What the soil decides before you dig, and who decides the rest.

Luke GellFlorida Certified Pool/Spa Contractor CPC1460652 · Cocoa, FLPublished

The soil is the part of your pool you will never see and have no way to judge. Every builder says they handle it.

Most things about a pool are visible. You can look at the beautiful tile, run your hand over the finish, and hear the equipment. The soil is different: it gets covered by a concrete shell within a few weeks of the dig and nobody looks at it again for thirty years.

It is also the one thing that, when it is wrong, cannot be repaired cosmetically. A finish can be redone. A shell sitting on ground that moves is a problem you manage for as long as you own the house.

This is what we look at before a machine arrives, and what we would want asked of us.

1. Call Sunshine 811 before anything moves

Call before you dig. Brevard is densely populated, there are utilities everywhere, they are always exactly where you want to dig, and they are frequently not marked.

Sunshine 811 is the state's free locate service and the call is required by Florida law. It costs nothing and it is the cheapest step in the entire project.

2. Have an engineer look at the soil

We are strong advocates for soil engineering: having the soil checked for what it actually is and what it will carry, especially on the island.

Here is the part homeowners are never told. On a big project, backfill gets brought in and compacted — for the house. Not for the pool. The pad the home sits on was engineered and inspected. The back yard, where your pool is going, often was not.

Half good ground is worse than uniformly poor ground. A pool that settles evenly is a problem. One part of the shell moving while the rest of it stays put is an even bigger problem. So a pool sitting half on engineered fill and half on material that was never demucked properly is the bad case, and it is not uncommon.

3. Checking the water table before the machine shows up

You can get a good idea before anyone spends money. How close is the property to the beach, and how high is the water sitting around it.

If there is a canal or a ditch near the house, look in it. When you can see the water, you can see roughly where the water table is. That is not a substitute for the soil report, but it tells us what to expect and it tells you why we are asking. We even dig holes with a post-hole digger on site.

4. Understand what the ground is being asked to carry

A house spreads its weight across three or four thousand square feet of footprint. A pool concentrates everything it weighs into four to eight hundred square feet, and then fills itself with water.

So the soil under a pool is not being asked the same question as the ground under a house pad, and the compaction that satisfied one does not automatically satisfy the other. That is the whole reason this note exists.

Under our shells, the standard is a minimum four inches of compacted rock across the entire footprint, so the shell is evenly supported rather than bridging between firm spots. Typically, it's even larger for pools that we run into issues with soils. You have to over excavate the site and compact a good base at six-inch lifts.

What "engineered" means, and what a rule of thumb is worth

A licensed engineer produces sealed structural plans for your pool, on your lot, and those drawings govern. There is always a pool construction rule of thumb, and it never supersedes the engineer.

The rule of thumb, for what it is worth: a Florida pool typically gets engineered to something around a six inch shell with #3 bar at twelve inches on center. That is the minimum end of normal.

We build heavier than that, deliberately:

  • Eight inch minimum shell thickness. More concrete is more strength and a more watertight structure.
  • A #4 rebar grid or larger, sized as engineered for the project.
  • A 5,000 psi minimum mix. Published shotcrete guidance puts the minimum for a pool at 4,000, and 5,000 where the concrete is exposed to chlorides. A pool on this coast is, so we shoot 5,000 and do not treat it as the exception.
  • Rigid plywood form boards. Flexible forms bow under shotcrete placement, which gives you a shell that is thick in some places and thin in others. Where a freeform design needs flexible forms, we shorten the form widths to hold the shape.

A rule of thumb never supersedes a licensed engineer. If a builder quotes you a thickness or a bar size without reference to the drawings for your pool, they are describing a habit, not a specification.

If the shell is already there, measure it against its own drawings

On a renovation we are looking at somebody else's work, usually decades old, and the shell is the one thing we cannot see until we open it up.

About two out of three shells we open have somewhere that was shot four inches thick. Usually not the whole pool: one or two spots where the dig caved in, or where the pool was not measured correctly and the excavation stopped short while someone was chasing an exact height. That is below the minimum end of what gets engineered today, and it is invisible from the deck on a pool that has been holding water for thirty years.

This is worth knowing rather than worth panicking about. A thin shell is not automatically a failing shell. But it changes what a renovation can responsibly do to it, and finding out at chip-out is better than finding out afterwards.

A job where the ground changed the plan

On the Satellite Beach freeform pool and spa, the plan was to add a sun shelf. That was the scope.

Once we were into it, we found cracking in the bond beam and leaks. Most builders would not have opted to fix it. They would have just left it and poured concrete for the sun shelf and gone on to the next job, but we decided to dig deeper and found a remedy to structurally modify the shell and add on shotcrete.

So we demolished the top foot of the pool, built the sun shelf properly, rebuilt the entire bond beam, and shot the shell thicker to deal with what we had found. You can see how that one came out.

That is what finding out early buys you. The same discovery two stages later is a different conversation entirely.

What to ask pool builders about soil

Four questions, and you do not need to understand the answers in detail. You need to hear whether they come easily.

  1. Have you built beachside before? Not just in Brevard. Beachside specifically.
  2. What do you expect the water table to do on this property? Somebody who works here has an opinion before the report comes back.
  3. What do the engineered plans call for, and can I see them? The answer is a document, not a number from memory. Are they even ordering a soil investigation?
  4. Are you comfortable installing the product I am asking for? A lot of builders will quote a high-end material and install it incorrectly. The materials are not interchangeable and neither is the knowledge of how to set them.

You will not supervise the dig, and you should not have to. But the ground is the one decision that is effectively permanent, and the people who take it seriously are easy to tell apart from the people who do not, because they answer without hesitating.

Luke GellFlorida Certified Pool/Spa Contractor CPC1460652 · Cocoa, FL